15.08.2019

Eiger Express heavy transport traction cables

In the night of 23 /24 August 2019, the third section of the traction cables for the new tricable gondola Eiger Express will be delivered by road.

The heavy transport to Grindelwald will take place between 21.00 h and 01.00 h. The crossing over the new base bridge is scheduled for 08.00 h.

Traffic delays and waiting times of up to 40 minutes can be expected on the road between Zweilütschinen and Grindelwald Grund. Along the affected route, posters will be set up to inform road users about the heavy transport.